For many homeowners their kitchen is the heart of their home. It plays an important role because it is where meals are prepared, families gather, and memories are made. When you choose to undertake a kitchen remodel, you're not just altering a room, you're reimagining one of the most cherished and coziest spaces.
But many wonder how long this type of remodel can take.
The answer to this question is not straightforward, so in this detailed blog post, we'll look at the factors that affect the timeline of a kitchen remodel and provide you with a general idea of what to expect.
Average Time Frames For Different Types Of Kitchen Remodels
There is not really a one-size-fits-all timeline when it comes to remodeling a kitchen, or frankly any room in your home. While the typical kitchen remodel can take 4 to 8 weeks, different types of kitchen remodels will affect the overall timeline, including the following:
#1. Cosmetic Updates (A couple days to 1-2 weeks)
Cosmetic updates involve quick, surface-level changes that do not really require any major construction work. Since these updates are for appearance and don't involve significant structural changes, they can usually be completed in a few days or 1 to 2 weeks.
- Painting the walls
- Refinishing or painting existing cabinets
- Updating hardware like cabinet pulls and faucets
- Installing new light fixtures to enhance the environment
#2. Moderate Remodel (4-8 weeks)

A moderate kitchen remodel involves more substantial changes along with cosmetic updates. These changes typically don't require extensive demolition or structural work, so a moderate remodel can usually be completed in 4 to 8 weeks.
- Replacing countertops with new materials like granite or quartz
- Updating appliances with newer, energy-efficient models
- Making minor layout changes such as moving a sink or adding an island
#3. Major Renovation (8-12 weeks)
If you are planning a major kitchen renovation, be aware that it may involve huge changes that require more planning, demolition, and construction work. These extensive changes can take around 8 to 12 weeks to complete, requiring professional help.
- Installing entirely new cabinetry
- Upgrading electrical and plumbing systems.
- Adding new windows, doors, or other architectural elements
- Changing the overall footprint of the kitchen through expansion or reconfiguration
#4. Full Custom Remodel (3-5 months)
A complete custom remodel completely transforms the kitchen by adding high-end, customized features. These kinds of projects typically last 3 to 5 months in order to allow for the careful planning, production, and installation of complex, personalized kitchen features.
- Structural changes
- Integration of top-of-the-line appliances, fixtures, and finishes
- Detailed design process involving interior designers if necessary
- Specialized fabrication and installation of custom elements
Also Read: A Detailed Kitchen Remodel Checklist For Homeowners In 2024
The Phases Of A Kitchen Remodel
Now that you know how long different types of kitchen remodels can take, Here’s a step-by-step guide on the phases that occur during a major kitchen renovation.
1. Planning Phase
The planning phase is the foundation for your kitchen remodel, involving key choices in design, materials and budget decisions. This phase can last 2 to 4 weeks, depending on decision-making speed and necessary approvals.
- Set a Budget: Determine financial limits, considering materials, labor, permits, and unexpected costs.
- Choose the Design and Layout: Collaborate with a designer or use software to plan layout, style, color scheme, and features.
- Select Materials and Appliances: Decide on cabinets, countertops, flooring, lighting, and appliances that fit your needs and budget.
- Hire a Contractor: Research and interview contractors, checking references and past projects thoroughly.
2. Pre-Construction Phase
Following planning, the pre-construction phase readies the home for the remodel to start and generally lasts 1 to 3 weeks.
- Obtain Permits: This is the time to secure necessary permits for electrical, plumbing, or structural work.
- Order Materials: There should be enough time to order and receive materials and appliances ahead of construction.
- Schedule a Start Date: Coordinate with your contractor to set a project commencement date.
3. Demolition Phase
Demolition initiates the physical transformation of your kitchen, typically spanning 1 to 2 weeks, depending on the size of the project and its complexity.
- Remove Cabinets and Countertops: Dismantle and dispose of existing cabinetry and countertops.
- Extract Appliances: Disconnect and remove old appliances.
- Demolish Walls and Floors: Adjust or remove walls and flooring as needed.
4. Construction Phase

The construction phase is the core of the kitchen remodel, involving several critical tasks over an estimated period of 4 to 8 weeks.
- Framing and Structural Work (1-2 weeks): Done to modify or reinforce structures as needed.
- Plumbing and Electrical Work (1-2 weeks): New plumbing and electrical systems are put in.
- Cabinet and Countertop Installation (1-2 weeks): New cabinets and countertops and fitted and installed.
- Flooring Installation and Painting (1-2 weeks): New flooring is put down and the walls are painted as necessary.
5. Final Touches and Inspections
Concluding the construction phase involves making any final adjustments and getting professional inspections to ensure the work is done to standard. This can typically take as a week to get done.
- Install Fixtures and Appliances: Connect and install new fixtures and appliances.
- Final Inspections and Approvals: Verify that all work complies with building codes and standards.
- Resolve Remaining Issues: Address any final adjustments or touch-ups.
- Clean: Thoroughly clean and prepare the kitchen for immediate use.
Factors Affecting The Kitchen Remodel Timeline
1. Scope of the Project
The type of renovations you're making will determine the length of the project, including any surprise repairs that you may have to make.
2. Structural Changes
Projects involving moving walls or adjusting plumbing and electrical systems extend the timeline due to architectural and engineering considerations.
3. Custom vs. Stock Cabinetry and Countertops
Choosing between custom-made, stock, or semi-custom cabinetry and countertops impacts project timelines. Custom options often involve the time it takes to make the product, which can delay installation compared to the already available stock alternatives.
4. Material Availability and Lead Times
Having access to materials is very important. Delays can occur when certain items, such as appliances or specialty tiles, have long lead times or are in high demand.
5. Permit Processing
Getting the required permits is crucial and can significantly push back the start date of the project. Depending on local rules and the complexity of your remodel, obtaining permits may take several weeks or even months.
6. Complexity of the Design
Complex designs, or needing different specialists to coordinate such as electricians, plumbers, and cabinetmakers, can extend remodels. Detailed planning and precise execution are crucial to align with the design vision.
What Is The Cost Of Remodeling A Kitchen?
The overall expenses in kitchen remodels can cost you from $10,000 for minor updates to $100,000 or more for extensive renovations. Keep in mind, however, that this cost can be affected by numerous factors such as local labor rates and the cost of materials.
Related Post: How Much Does a Small Kitchen Remodel Cost (2024 Guide)
Hire The Expert Kitchen Remodelers At McClellands Contracting and Roofing
A kitchen remodel is one of the most exciting home improvement projects you can undertake. Having the a brand-new, modern kitchen can be exciting, but the journey there can also be challenging.
While sticking to a timeline is important, prioritize creating a beautiful, functional kitchen that enhances your home and lifestyle. Understand the factors influencing project duration and plan wisely for your remodeling project.
That’s why, to get the best service and kitchen possible, you’ll want to trust the experts at McClellands Contracting and Roofing for your remodeling needs. With a focus on quality kitchen remodeling services, we ensure efficient and satisfying results. Whether it's updating countertops, installing custom cabinetry, or redesigning your kitchen’s layout, our team can do it. Call us today at (412) 353-5660 to learn more.